| 1 |
Product Quality Management |
14% |
Current ISO 9001 certification covering the relevant manufacturing activities, supported by documented inspection and corrective-action procedures. |
Valid certificate, scope statement, recent audit summary, inspection plan, and nonconformance records with corrective actions. |
Reduces variation in bit geometry, carbide retention, brazing quality, and finished-product consistency. |
| 2 |
Bit Geometry and Dimensional Control |
12% |
Manufacturing dimensions, gauge diameter, shank configuration, flushing holes, and tolerances must match the approved technical drawing and applicable drilling-tool specification. |
Controlled drawings, dimensional inspection reports, gauge reports, calibration records, and sample approval documentation. |
Correct geometry supports hole accuracy, tool compatibility, penetration performance, and reduced vibration. |
| 3 |
Carbide Grade and Insert Integrity |
12% |
Carbide grade, hardness, transverse rupture strength, grain size, and chemical composition must be traceable to the agreed material specification. |
Material certificates, laboratory test reports, batch traceability, carbide supplier documentation, and metallographic inspection results. |
Carbide properties directly influence wear resistance, impact durability, and service life in abrasive rock formations. |
| 4 |
Metallurgy and Heat Treatment |
10% |
Steel body material and heat-treatment parameters must be defined, repeatable, and verified against the approved specification. |
Steel mill certificates, hardness results, heat-treatment charts, furnace records, and microstructure test results where applicable. |
Proper steel properties help prevent premature body wear, cracking, deformation, and brazed-joint failure. |
| 5 |
Field Performance and Wear Life |
10% |
Performance should be demonstrated under comparable rock type, drilling method, bit diameter, feed force, rotation speed, and flushing conditions. |
Controlled field-trial reports, penetration-rate data, meters drilled, failure analysis, photographs, and customer-approved test records. |
Laboratory claims alone may not reflect actual performance in hard, fractured, abrasive, or wet formations. |
| 6 |
Production Capacity and Lead-Time Reliability |
10% |
Capacity should be demonstrated through documented monthly output, production planning, bottleneck analysis, and historical on-time delivery performance. |
Capacity statement, production schedule, sample lead-time records, on-time delivery data, and contingency plans for peak demand. |
Reliable supply is essential for drilling contractors operating multiple rigs or remote projects. |
| 7 |
Customization and Technical Support |
8% |
Supplier should be able to adapt button layout, face design, flushing configuration, shank dimensions, and brazing parameters to the approved application. |
Engineering drawings, design-change procedure, application engineering records, technical data sheets, and trial-development process. |
Application-specific design can improve penetration, hole straightness, flushing efficiency, and bit life. |
| 8 |
Traceability and Quality Documentation |
8% |
Each production batch should be traceable from raw materials through machining, carbide installation, heat treatment, final inspection, and shipment. |
Batch numbers, inspection certificates, material traceability records, packing lists, and retention policy for quality documents. |
Traceability enables fast root-cause analysis, controlled recalls, and reliable comparison between production batches. |
| 9 |
Export Compliance and Logistics |
8% |
Supplier should provide accurate HS classification, export documentation, origin information, packaging specifications, and agreed Incoterms® for international shipments. |
Commercial invoice sample, packing list, certificate of origin process, export-control statement, packaging test records, and logistics references. |
Complete documentation reduces customs delays, transportation damage, and unexpected landed-cost exposure. |
| 10 |
After-Sales Service and Corrective Action |
8% |
Supplier should maintain a written warranty, complaint-response procedure, failure-analysis process, and defined corrective-action timeline. |
Warranty terms, return-material procedure, response-time commitments, failure-analysis reports, and customer service contacts. |
Effective support limits downtime and helps identify whether failures result from product design, operating conditions, or drilling parameters. |